Project Updates

Print
Press Enter to show all options, press Tab go to next option

check back for updates

County Highway Construction and Paving Project Updates as of 09/16/2019

A

Mayflower Rd to WIS 47

Towns of Black Creek & Bovina

Project Description

Reconstruction of CTH A from Mayflower Road to STH 47.  Work items consisting of Base Aggregate, Culvert Pipes, Curb & Gutter, Erosion Control, Grading, HMA Pavement, Landscape Restoration, Pavement Marking, Signage, & Other Incidental Items.

Project Status

Peters Concrete is expected to start reconstruction the first week of July and completion is anticipated early October, 2019.

Sept. 16th week’s work: Continue shaping ditches and spreading topsoil throughout the project.  Place asphaltic pavement on project.

Traffic Impacts

Highway will be closed to through traffic.  Detour will be WIS 76 and CTH S.

More Information

Capital Improvement Program

CTH A Webpage

 

A

WIS 76 to Mayflower Rd

Towns of Black Creek & Bovina

Project Description

The highway is in need of wider paved lanes, paved shoulders, and flatter ditch slopes to meet current County highway design and safety standards.

Project Status

Utility relocation in 2019.

WIS 76 to Mayflower Rd – Construction planned for 2020

Traffic Impacts

Highway will be closed to through traffic.  Detour planned to be Hwy 76 and CTH S.

More Information

Capital Improvement Program

CTH A Webpage

 

 

CA

CTH CB to Mall Drive

Towns of Grand Chute & Greenville

Project Description

The highway will be reconstructed as a 4-lane divided urban highway with curb & gutter on both the median shoulder and outside shoulder.  Multi-lane Roundabouts are planned at the intersections of Mayflower Drive and at McCarthy Road to improve operations and safety. A multi-use trail will be constructed on the north side of the highway, and sidewalks and pedestrian crossings of CTH CA are planned at the roundabouts.

Project Status

Right-of-way acquisition is complete. 

Utility relocation in 2019.

Reconstruction in 2020.

Traffic Impacts

Portions of the highway will be closed during construction. The signed detour route will be I-41, Highway 96, and County CB.  Construction planned for 2020.

More Information

Capital Improvement Program

CTH CA Webpage

 

 

CB

& Atlantis Intersection (north of CTH CA)

Town of Greenville

Project Description

Construct a multi-lane roundabout at the intersection of County CB & Atlantis Drive.  Also realign Discovery Drive intersection to Atlantis Drive.

Project Status

Vinton Construction started construction the week of August 5th and anticipate completion the end of October 2019.  Intersection is scheduled to close September 3, 2019. 

 

Traffic Impacts

Phase 2 will be the County CB & Atlantis intersection. County CB will be closed to through traffic during Phase 2.  The signed detour for County CB will be County CA, I-41, and Highway 96.  We will be opening up the newly constructed section of Discovery Dr. and the intersection with Atlantis Drive early Tuesday morning, September 3rd.

More Information

Capital Improvement Program

CTH CB Webpage

 

 

CE

& Railroad Street Intersection

Village of Kimberly

Project Description

Traffic study, design, and future reconstruction of the intersection. Several alternatives are being considered, including traffic signals, roundabout and unique alternatives that have restrictions to cross traffic.

Project Status

Conceptual alternatives were presented to Kimberly Planning Commission in December 2018.  Preliminary plans and a full public informational meeting is planned in Fall 2019.  Reconstruction may be as early as 2021.

Traffic Impacts

Pending

More Information

County CE & Railroad Street Webpage

 

 

CE

and CTH K (Buchanan Rd) Intersection

Town of Buchanan

Project Description

Study and design of intersection improvements

Project Status

The median was closed to cross traffic in May 2018.  The Highway Dept has been studying the impacts the median closure has on safety and operations.  No new operational issues have been discovered at key adjacent intersections.

The County continues to work with the Village of Combined Locks and Town of Buchanan regarding the future of the intersection. 

Traffic Impacts

County CE Traffic can make a right turn onto Buchanan Road, and Buchanan Road traffic can make a right turn onto County CE.  All Buchanan Road cross movements are restricted.

More Information

Capital Improvement Program

 

 

 

CE

WIS 55 to CTH Q

City of Kaukauna

Project Description

Improve existing asphaltic surface by pulverizing existing pavement, regrading stone base and installing a new asphalt surface. Spot improvements are planned for traffic operations and safety.

Project Status

Replace Culverts in 2019.  Repaving planned for 2020.

Traffic Impacts

The highway will be closed to through traffic. The signed detour route will likely be Highway 55, County KK, and County D in Brown County

More Information

Capital Improvement Program

 

 

 

CE

CTH Q to Haas Rd

Town of Buchanan, City of Kaukauna

Project Description

Improve existing asphaltic surface by pulverizing existing pavement, regrading stone base and installing a new asphalt surface. Spot improvements are planned for traffic operations and safety.  An extension of the CE Trail is planned.

Project Status

Construction planned for 2020.

Traffic Impacts

The highway will be closed to through traffic. The signed detour route will likely be Highway 55, County KK, and County D in Brown County

More Information

Capital Improvement Program

 

 

 

CE

Weiler Rd to Outagamie Rd

Town of Buchanan

Project Description

Improve existing asphaltic surface by pulverizing existing pavement, regrading stone base and installing a new asphalt surface.  Culvert replacement planned for August 2019.

Project Status

Replace Culverts in September 2019.   Repaving planned for October 2019.

Traffic Impacts

The highway will be closed to through traffic. The signed detour route will likely be Highway 55, County KK, and County D (Brown County).

More Information

Capital Improvement Program

 

 

 

EE

(Ballard Rd)

CTH O to CTH S

Towns of Center and Freedom

Project Description

Improve existing asphaltic surface by pulverizing the pavement, regrading the stone base, and paving a new asphaltic surface

Project Status

Paving is in progress and will continue into the week of September 16th.  Shoulders, centerline rumble strips, striping and permanent signing through the end of September 2019.

Traffic Impacts

Highway will be closed to through traffic.  Detour expected to be County O, County C, and County S.

More Information

Capital Improvement Program

 

 

 

GV

and McCarthy Rd Intersection

Grand Chute

Project Description

Construction of a roundabout at the CTH GV intersection and reconstruction of McCarthy Road between Brookview Drive through the CTH GV intersection.

Project Status

Utility relocations and construction activities are ongoing.  Landscaping and restoration continues.  Paving anticipated the week of September 23rdth.  Shoulder, striping and signing through the end of September 2019. 

Traffic Impacts

County GV and McCarthy Rd will be closed to traffic. Detour expected to be Highway 96 and County CB.

More Information

Capital Improvement Program

 

 

 

JJ

CTH N to WIS 55

Town of Vandenbroek

Project Description

The highway is in need of wider paved lanes, paved shoulders, and flatter ditch slopes to meet current County highway design and safety standards. A roundabout is being designed at the intersection with CTH N. A multi-use trail is also being considered on the south side of the highway.

Project Status

Project is in design phase.  Right-of-way acquisition planned for 2020. Reconstruction is planned as early as 2021.

Traffic Impacts

A 4-way stop has been installed at the CTH N & CTH JJ intersection, and will remain until the intersection is reconstructed as a roundabout.

More Information

Capital Improvement Program

County JJ Webpage

 

 

JJ

Lightning Drive to French Road – Sanitary Sewer Construction, City of Appleton

Project Description

Kruzcek Construction has been hired by the City of Appleton to install underground sanitary sewer along County JJ between Lightning Dr. and French Rd. 

Project Status

Kruzcek Construction installing sewer pipe and is expected to be completed at the end of October 2019.

Traffic Impacts

Traffic will be shifted to southside of CTH JJ while crews install sewer on northside of highway.

More Information

Contact the City of Appleton here:  Appleton Road Report Updates

 

 

N

CTH KK to CTH CE

Buchanan/Calumet County

Project Description

The highway is in need of reconstruction to meet today’s highway standards.  The project will include a center turn lane between CTH KK to Emons/Buchanan Rd to allow thru traffic to bypass left turning vehicles at driveways and intersections. The roundabout at Emons/Buchanan Rd will be expanded to accommodate increased traffic volumes.  Traffic signals will be installed at the CTH CE ramp intersections.

Project Status

Project is in design phase.  Right-of-way acquisition may be in 2020. Roadway Reconstruction may be as early as 2023.

Traffic Impacts

The Highway will be closed to thru traffic during construction. The detour is expected to be County KK, Highway 55, and County CE.

More Information

Capital Improvement Program

 

 

 

N

Maes Avenue to Highway 96

Kimberly and Little Chute

Project Description

Concrete pavement repairs for pavement.

Project Status

Concrete sawing will be completed the week of August 19th.  Concrete joint repairs will be worked on August 26th through September 13th.  Partial depth repairs will be worked on the week of September 16th.

Traffic Impacts

Traffic will be reduced to 1 lane in each direction along County N during the project

More Information

Capital Improvement Program

 

 

 

OO

& French Road Intersection

Grand Chute, Little Chute

Project Description

Study and design intersection improvements. Intersection options may include signalization or restricting certain traffic movements.  The long term need and use of French Road between Highway 96 and County JJ will also be studied.

Project Status

Study to start in 2019.

Traffic Impacts

TBD

More Information

Capital Improvement Program

 

 

 

U

I-41 to WIS S

Town of Oneida, Brown County

Project Description

Design & reconstruct to current rural county standards, with wider lanes, paved shoulders and flatter ditch slopes.

Project Status

Project is in the design phase. Right-of-way acquisition is expected to be acquired in 2019.

Construction proposed as early as 2021.

Traffic Impacts

Highway will be closed to through traffic.  Detour expected to be I-41 and CTH S.

More Information

Capital Improvement Program

County U Website

 

 

 

Future Highway Projects

For future year projects, check out the Highway portion of the Outagamie County Capital Improvement Program.

 

Wisconsin Department of Transportation

For information on state and US highway projects in Outagamie County, contact the Wisconsin Department of Transportation or click on their website pages linked here:

WisDOT Northeast Region Weekly Project Updates

WisDOT Northeast Region Highway Projects and Studies

WIS 15 Expansion - US 45 - Lily of the Valley Dr.