Project Description: 

This project is for the design, right-of-way and future reconstruction to an urban roadway for this segment of highway. Current and planned development in the area has prompted the need for reconstruction to improve safety & operational efficiency, improve drainage, and provide multimodal accommodation. This project also includes utility improvements for the Town of Grand Chute and replacement of the existing railroad crossing located east of Wren Drive. Construction is currently scheduled for 2029

Project Status: 

Design survey, soil borings, and field work scheduled for 2025.

Project Documents:

CTH JJ Survey Letter sent February 2022

CTH JJ Project Update Letter sent November 2024

Preliminary Corridor Layout

Preliminary Roadway Cross Section

For more information please contact:
highwayemail@outagamie.org
or
920-832-5673