County Highway Construction and Paving Project Updates as of 08/25/2016

A

STH 76 to Mayflower Rd

Mayflower Rd to STH 47

Towns of Black Creek & Bovina

Project Description

The highway is in need of wider paved lanes, paved shoulders, and flatter ditch slopes to meet current County highway design and safety standards.

Project Status

Reconstruction could be scheduled as early as 2019

Traffic Impacts

Highway will be closed to through traffic.  Detour expected to be Hwy 76 and CTH S.

More Information

2016-2020 CIP - Pages 48 & 49

 

CTH A Webpage

 

CE

CTH CE & CTH HH Roundabout

Town of Buchanan, City of Kaukauna, Village of Combined Locks

Project Description

This project consists of improving the safety of this intersection by constructing a multi-lane roundabout based upon engineering recommendation and public input.

Project Status

See webpage

Traffic Impacts

CE & HH Webpage

More Information

 

 

HH

CTH CE to CTH Z

Town of Buchanan, City of Kaukauna, Village of Combined Locks

Project Description

This project consists of reconstructing the rural section between County CE and County K (Buchanan Rd) to rural county standards, and pavement replacement in the urbanized section between County K and County Z (State St).  The project includes wider paved shoulders to accommodate bicycles and pedestrians along the highway.

Project Status

CE & HH Webpage

Traffic Impacts

More Information

 

KK

Banta Court to Mathias Street

City of Appleton

Project Description

The proposed project is to reconstruct the roadway to meet current design standards. This is a City of Appleton lead project.   www.appleton.org for more information.

Project Status

Scheduled for the 2016 construction season.

Traffic Impacts

Highway will be closed to through traffic.

More Information

2016-2020 CIP - Page 75

 

 

 

 

MM

Mystic Drive to STH 76

Village of Hortonville, Town of Ellington

Project Description

The proposed project is to improve the existing asphaltic surface by reclaiming and installing a new asphalt pavement for this segment of highway.  Slight adjustments to horizontal and vertical curves will be made.

Project Status

The work is scheduled to start August 24, 2016 and be completed mid-September. 

Traffic Impacts

Roadway will be closed to through traffic.  Detour to be County M, County S and Highway 76

More Information

2016-2020 CIP - Page 80

 

 

OO

CTH E to Hwy 441 Pavement Repairs

Project Description

Concrete pavement repairs will be performed in two stages. Stage 1 will include the outside driving lane and right turn lanes in each direction. Stage 2 will include the joint between the 2 driving lanes, the inside driving lane, left turn lanes and median areas.


Repairs need to be made within the intersections of Conkey St, Roemer Road, and the business driveway intersection to Pick ‘n Save (south) and Galvan’s Restaurant/Super Bowl (north). These repairs will require turn lane restrictions or full closures of these intersections at times.


Repairs will also be made during multiple weekends at critical locations to minimize impacts to the traveling public during the work week.

Project Status

 

Project Webpage

Traffic Impacts

More Information

 

 

N

Maple Street to CTH E

Town of Freedom

Project Description

The proposed project is to improve the existing asphaltic surface by reclaiming and installing a new asphalt pavement for this segment of highway. Improvements are also planned at the bridge over Apple Creek.

Project Status

Project is scheduled for 2016.

Traffic Impacts

Highway will be closed to through traffic.  Detour for the bridge work is planned to be CTH JJ, Hwy 55, CTH UU.

More Information

2016-2020 CIP - Page 82

 

ZZ

CTH Z to East County Line

Town of Buchanan

Project Description

This project consists of design, right-of-way, and reconstructing the current two lane facility to current county standards. The project will upgrade a portion of Haas Rd and CTH ZZ from CTH Z to Nackers Road to current safety standards with widened lanes and shoulders, wider curves, and flatter side slopes. 

Project Status

Scheduled to begin during the 2017 construction season.   This is a 2-year construction project.

Traffic Impacts

To be determined.

More Information

http://www.outagamie.org/index.aspx?page=1469

 

2017-2020 Highway Projects

For future year projects, check out the Highway portion of the Outagamie County 2016-2020 Capital Improvement Program.

 

Wisconsin Department of Transportation

For information on state and US highway projects in Outagamie County, contact the Wisconsin Department of Transportation or click on their website pages linked here:

WisDOT Northeast Region Weekly Project Updates

WisDOT Northeast Region Highway Projects and Studies

WIS 15 Expansion - US 45 - Lily of the Valley Dr.

WIS 55 (Delanglade St.), from Lawe St. to I 41

WIS 441 Tri-County Project

Last updated: 8/25/2016 8:36:13 AM